2000 2001 Volkswagen Poznań Sp. z o.o. A sand storage building – a comprehensive design of a storage building with a steel and reinforced concrete structure.
2000 2000 Volkswagen Poznań Sp. z o.o. A reinforced concrete ventilation stack with reinforced concrete inlet ducts.
The investment project is part of the new paint shop of VW Poznań located in Poznań-Antoninek.
The stack, 68.00 m high and with dimensions of 6 x 11 m, rests on piles and elastically supported, through the inlet ducts, on the steel structure of the building.
2001 2001 Lafarge Cement Poland A slab foundation underneath a heater tower, resting on piles.
The investment project is part of a new clinker firing line at the KUJAWY cement plant in Piechcin near Żnin in the Kujawsko-Pomorskie province.
The height of the tower is approx. 130 m.
The number of piles is 72.
The surface area of the foundation is approx. 1,000 m2.
2002 2002 Lafarge Cement Poland The foundation of a raw material (limestone) ball mill.
2001 2001 Wrigley Poland Reconstruction of a production building with a new intermediate ceiling.
Surface area 1,600 m2.Steel structure weight 320 t.
2002 2002 Lafarge Cement Poland A detailed design of a building for a raw material mill and raw material mill dust collectors.
A steel support structure for technological equipment.
Structure dimensions: H = 51.40 m, B = 22.00 m, L = 47.00 m, Steel structure weight 820 t.
2002 2002 Lafarge Cement Poland A circular limestone storage building.
A steel structure building:Diameter D = 90.50 m, height H = 26.5 m
Steel structure weight 306 t.
2002 2002 Lafarge Cement Poland A foundation for a limestone scraper.
2002 2003 Elana S.A. Dynamic calculations (amplitudes of forced vibrations including damping) of a tower (7×8×50 m) with a steel structure, loaded with fans with a rotational speed from 1,500 to 3,000 rpm.
2003 2003 Lafarge Cement Poland A substitute design of the steel structure of a raw material mill building.
2002-2003 2002-2003 Volkswagen Poznań Sp. z o.o. Steel technological platforms in a building adapted for production purposes.
Total structure weight 100 t.
2003 2003 Paper Factory Czerwonak A comprehensive design of a production building at the Paper Factory in Czerwonak near Poznań.
A steel building with internal transport and foundations for technological equipment.
2003 2003 Volkswagen Poznań Sp. z o.o. A water cooling station building.
A multi-discipline design of a storage building with a steel and reinforced concrete structure.
2003 2003 Yagi Factory Poland A building design and a detailed design of a foundation for an impact press.
2004 2004 Volkswagen Poznań Sp. z o.o. A multi-discipline design of a steel structure shelter over a railway siding.
2004 2004 Volkswagen Poznań Sp. z o.o. A detailed design for demolition of a reinforced concrete firefighting water reservoir.
2004 2004 Volkswagen Poznań Sp. z o.o. A multi-discipline design of the company’s car park and landscaping.
2004 2004 Vibracoustic Poland A workshop design of a steel structure for a storage building, 73 m long, with a 26 m span, and 11 m high.
2004 2004 A2 Bau Development GmbH Reinforcement of the ground in the section of the A2 motorway between Nowy Tomyśl and Komorniki, between KM118+080 and KM118+515. A building design and a detailed design of a reinforced concrete slab supported on reinforced concrete driven piles.
2004 2004 Hochtief Poland, Poz-Building branch A building design and a detailed design of an underground, reinforced concrete, multi-chamber firefighting water reservoir.

Volume 470 m3.

2004 2004 Volkswagen Poznań Sp. z o.o. A design of external water supply and sewer, central heating, power, gas, and compressed air networks at plant no. 3 in Poznań.
2004 2004 NYSTAL S.A. A detailed design of a storage building with internal transport 2 x 10T.
2004 2004 Pfeifer & Langen Polska S.A., Sugar Plant Środa A building design project of sugar packaging plant with a segregation tower in Środa Wielkopolska.

Usable surface area 16,930.0 m2.

Cubic capacity 124,100.0 m3.

2005 2005 Pfeifer & Langen Polska S.A., Sugar Plant Środa A detailed design and a workshop design of a sugar packaging plant, together with the segregation tower in Środa Wielkopolska; a reinforced concrete and steel structure.

Total steel structure weight 900 t.

2005 2005 BODEKO

Sp. z o.o.

A building design, a detailed design, and a workshop design of a storage building with 2 × 10 T supported transport, span of 27 m. Total structure weight 125 t.
2005 2006 Municipal Sports and Recreation Center

Poznań

Optimization, a detailed design, and a workshop design of a steel structure of the canopy over the 4th stand of the Municipal Stadium in Poznań.
2006 2006 Zawiercie Steelworks A building design, a detailed design, and a workshop design of a reinforcement prefabrication building with supported transport 2×10 T.

Total structure weight 275 t. Span of 34 m.

2006 2006 International Poznań Fair A building design, a detailed design, and a workshop design of building no. 16 at the International Poznań Fair center. Span of 50 m.
2006 2006 International Poznań Fair A detailed design and a workshop design of building no. 8 and an alleyway at the International Poznań Fair center. Total structure weight 450 t.
2006 2007 BODEKO

Sp. z o.o.

A building design, a detailed design, and a workshop design of a reinforcement prefabrication building with supported transport with the lifting capacity of 2 x 2 × 10 T.

Total structure weight 300 t. Span of 2 x 30 m.

2006 2007 TRANS-PLAST Preparation of building and detailed documentation for reinforced concrete and steel structures in the production and storage building of Trans-plast in Suchy Las near Poznań.
2006 2007 Pfleiderer A building design, a detailed design, and a workshop design of technological platforms.

Total structure weight 200 t.

2007 2007 Pfleiderer A building design, a detailed design, and a workshop design of the cyclone tower. Height 42 m – structure + 6 m cyclone.

Total structure weight 100 t.

2007 2007 Carrefour Poland Preparation of a workshop design for the steel structure of the Carrefour Shopping Center in Lublin.
2007 2007 DECORA S.A. Preparation of a building design and a detailed design of a storage building for DECORA S.A. in Środa Wielkopolska.
2007 2007 LENA Lighting S.A. Preparation of a detailed design of reinforced concrete structures of a building at LENA Lighting S.A. in Środa Wielkopolska.
2007 2008 MGC Inwest

Sp. z o.o.

A building design.

Cuprum Shopping Mall in Lubin. Segments R, H, L, and E. A shopping mall with a reinforced concrete structure, with 4 floors. Usable surface area 15,000.0 m2.

2007 2007 BODEKO

Sp. z o.o.

A building design, a detailed design, and a workshop design of a storage building with 2 x 2 × 10 T supported transport, span of 32 m.
2007 2007 Ruukki Construction Polska Sp. z o.o A detailed design of the structure of the foundation for the shotblasting machine in the production building in Oborniki Wielkopolskie.
2007 2007 Huta Ferrum S.A. A building design, a detailed design, and a workshop design of a storage building with 2 × 10 T supported transport, span of 33.5 m.
2007 2007 Ruukki Construction Polska Sp. z o.o A design of support structures for 10 t overhead cranes in the ECO building and a 32 t overhead crane in the metal sheet storage building at Ruukki Construction in Oborniki Wielkopolskie.
2007 2007 TARKON-GRADI Sp. z o.o. Wrocław A substitute design and a workshop design of a high bay storage building. Span of 30.3 m.
2007-2008 2008 MGC Inwest

Sp. z o.o.

A detailed design.

Cuprum Shopping Mall in Lubin. Segments R, H, L, E, and Q. A shopping mall with a reinforced concrete structure, with 4 floors. Usable surface area 15,000.0 m2.

2007 Prekybos Centras A building design of the MAXIMA shopping center in Vilnius. Surface area of 22,000 m2.
2008 2008 MGI Polska

Sp. z o.o.

A building design, a detailed design, and a workshop design of a BRICO store in Środa Wielkopolska, 40 t.
2008 2008-2009 Ruukki Construction Polska Sp. z o.o Preparation of detailed documentation for the foundation of a longitudinal sheet metal cutting line. Total volume of the reinforced concrete structure 900 m3.
2008 2008-2009 Pfleiderer Novgorod MDF A detailed design (node design) and a workshop design of support structures for the MDF board production line. Total structure weight 1,000 t.
2008 2008 Zakład Kuźnia Matrycowa Sp. z o.o. A detailed design of the foundation of the MPM 31500B hammer with direct support of the anvil on spring vibration isolators combined with viscous dampers.
2008 2008 Ruukki Construction Polska Sp. z o.o Preparation of the detailed documentation for the foundation for the “DURMA” press in a building at Ruukki Poland in Oborniki.
2008 2008 HAMA Polska

Sp. z o.o.

Static calculations and a detailed design of a reinforced concrete prefabricated office building. Cubic capacity 8,960 m3.
2008 2008-2009 PFLEIDERER EUROPOLES Sp. z o.o. Static calculations, a detailed design (node design), and a workshop design of the mast production building. Total structure weight 1,000 t.
2009 2009-2010 EURO 2012 Verification of static calculations, a detailed design (node design) and a workshop design of the steel structure of the roof of the Municipal Stadium in Poznań. Total structure weight 6,000 t.
2009 2009 ZINKPOWER WIELKOPOLSKA A workshop design of the steel structure of the galvanizing plant. Total structure weight 300 t.
2009 2009 SWEDWOOD Poland Sp. z o.o. A multi-discipline building design and a workshop design of the flyover between production buildings. Length 140 m.
2009 2009 SWEDWOOD Poland Sp. z o.o. A multi-discipline building design and a workshop design of the flyover in a production building. Length 65 m.
2009 2009 SBN Runowo Sp. z o.o. A building design, a detailed design, and a workshop design of a storage building with 2 × 10 T supported transport, span of 25 m.
2009 2009 EURO 2012 A design of the crossbeams used during the assembly of 460 t girders – Municipal Stadium in Poznań.
2009 2010 SITAG Formy Siedzenia Sp. z o.o. A building design, a detailed design, and a workshop design of a production and assembly building with an office building.
2009 2010 Port Lotniczy Wrocław S.A. A design of slings and an assembly support, verification of the stability of the steel roof structure of the terminal building at the assembly stage.
2010 2010 Polskie Górnictwo Naftowe i Gazownictwo S.A. A foundation for a 230 PK steam turbine.
2010 2010 SWEDWOOD Poland Sp. z o.o.

Bielsk Podlaski

An MDF board production line – Energy Center.

A building design. Steel structure weight 350 t. Height 35 mm.

2010 2010 SOLARIS Bus & Coach Sp. z o.o. Środa Wielkopolska A building design for extension of a production building with a welfare and office building. Production building 3,500 m2, office building 1,200 m2.
2009 2010 SIMET S.A. in Piaski A building design, a detailed design, and a workshop design of a production and storage building with a back office in Grabonóg. Building 3,500 m2, back office building 800 m2.
2010 2010 Segro – Schweitzer Mauduit Inc. Stryków / Łódź Foundations of machines and technological equipment for cutting and smoothing in an existing production building.
2010 2010 DALMET Wieniawa A detailed design of the steel structure of a technological platform with the dimensions of 11.0 x 12.0 m in the existing building.
2010 2010 SOLARIS Bus & Coach Sp. z o.o. Środa Wielkopolska A detailed design of the structure of a production building with a welfare and office building in Środa Wielkopolska. Overhead crane track substructure, foundations for machinery and equipment.
2010 2010 Z.U.O. Świdnica A design and supervision over the construction of the foundation of power generator sets on elastomeric vibration isolators.
2010 2010 ALUPIAST Poznań Detailed designs and workshop designs of the structure of the office building and the storage building in Poznań.
2010 2010 CCC Polkowice A detailed design and a workshop design of a low building and of a support structure for photovoltaic cells.
2010 2011 Inter IKEA Centre Polska S.A. A detailed design and a workshop design for the structure of a conservatory at the OBI store in Poznań.
2010 2011 Samsung Heavy Industries Co. LTD. S.A. Detailed and workshop designs of the supporting structure for overhead cranes with the lifting capacity of 2×25 t, 25 t, and 35 t in the existing production building.
2011 2011 A-2 motorway A workshop design of the structure of a shelter over the A-2 toll motorway at the toll collection point in Nowy Tomyśl.
2011 2011 Pątnów-Adamów-Konin Power Plant Group A detailed design with static calculations of the support structures for shredders at the Forest and Agro biomass sorting plants.
2010-2011 2011 Konsorcjum Stali S.A. A building design, a detailed design, and a workshop design of the production and storage building together with reinforced concrete technological foundations. A three-bay steel building (bay spans: 32.3 m, 27.4 m, and 29.6 m) with supported transport. Overhead crane load capacity 10 t, 16 t, and 25 t.

Surface area of 9,642 m2. Steel structure weight 550 t.

2011-2012 2012 FLEX FILMS EUROPA A substitute building design, a detailed design, and a workshop design of the steel structure of the production and storage building with supported transport.

Surface area of 15,685 m2.

2011-2012 2011-2012 WPIP A building design of an office building.
2012 SITAG Formy Siedzenia Sp. z o.o. A building design for expansion of a production building.
2012 2012 International Poznań Fair A detailed design and a workshop design, together with calculations of connections and a redesign the roof bracing of lattice girders of the Poznań International Fair Congress Center.

Surface area of 3,500 m2.

Steel structure weight 550 t.

2012 2013 Trigranit Development Corporation Static calculations, a detailed design, and workshop drawings of a steel structure of the ZCK Poznań shopping center.

Roof surface area 30,000.00 m2.

Steel quantity used 1,200 t.

2012 2013 Volkswagen Poznań Sp. z o.o. A substitute building design, a detailed design of a steel and reinforced concrete structure, workshop drawings of a steel structure of a sequential assembly building at VW-Poznań. Steel structure weight 1800 t. A steel-concrete composite ceiling.
2013 2013 Hochtief Polska Sp. z o.o. A technical expert opinion on the structure of the Zagłębie Lubin stadium.
2013 2013 WPIP sp. Komandytowa sp. z o.o. A detailed design of an office building. Usable surface area 3,000 m2.
2013 2013 Dieffenbacher GmbH A workshop design together with the design of the nodes of the support steel structure of the Forming Station building. Steel structure weight 330 t.
2014 2014 Gdańsk Airport A workshop design of the steel structure for the extension of the terminal. Structure weight 1,500 t.
2014 2014 Gdańsk Airport Static calculations and dimensioning of the steel structure of the terminal building in the assembly phases. A design of temporary steel support structures necessary during assembly.
2014 2014 Homanit Krosno Sp. z o.o Static calculations, node statics, and a workshop design of the steel support structure for MDF board production line equipment. Height 55 mm. Structure weight 1,200 t.
2014-2015 2014-2015 Gestamp sp. z o.o. Static calculations, node statics, a detailed design of a reinforced concrete structure, a workshop design of the steel structure of a production and storage building with supported transport – overhead cranes with the lifting capacity of 60 T. Building height 18 m. Built-over surface area 32,000 m2. Steel structure weight 2,200 t.
2015 2015 Wojciech Mizgier Static calculations, node statics, a detailed design of a reinforced concrete structure, a workshop design of the steel structure of a storage building. Building height 11 m. Built-over surface area 7,500 m2.
2015 2015 Homanit Krosno Sp. z o.o Static calculations, node statics, a detailed design of a reinforced concrete structure, a workshop design of the steel structure of a storage building. Building height 11 m. Built-over surface area 5,000 m2.
2016 2016 Zalando Verification of static calculations, a detailed and workshop design of a prefabricated office building. Usable surface area 5,000.0 m2.
2016 2016 Wood Sp. z o.o Static calculations, a detailed design, and a workshop design of a steel structure of the Wroclavia shopping center. Steel structure weight 1,200 t.
2017 2017 Sugar Plant Środa A building design and a detailed design for the reconstruction of the sugar packaging plant.
2018-2019 2018-2019 Gestamp sp. z o.o. Static calculations, node statics, a detailed design of a reinforced concrete structure, a workshop design of the steel structure of a production and storage building with supported transport – overhead cranes with the lifting capacity of 75 T. Building height 21 m. Built-over surface area 32,000 m2. Steel structure weight 1,500 t.